Year: 2023
Weight: 120 tons
Country: Denmark
Scope of contract: delivery of steel structure and railings, trial assembly, third party control of manufacturing and surface treatment, epoxy resin on the deck – QUBIK system
Additional information about the project:
- Material: corten
- Total bridge length: 130m, transported in 7 sections, the width of 1 section: 3m
- 5 meter long bridge supports (made of rolled plates)
- Railings made of twisted flat bars and brushed stainless steel handrails
- Complex construction geometry, verified by trial assembly
- On-site assembly with a 750 tons crane (one of the largest in Denmark)